Table of Contents relating to cost allocation, rate design, and the treatment of large electricity loads are ongoing in numerous jurisdictions, and adverse outcomes, changes in policy, or the imposition of new tariffs, surcharges, or curtailment obligations applicable to data centers could increase our costs or limit our access to electrical power. In addition, the construction of the generation and transmission infrastructure on which we depend is itself capital-intensive and exposed to labor shortages, supply chain disruptions, permitting delays, changes in interest rates, tariffs, other cost overruns, and financing constraints. The significant and increasing capital required to fund these generation, transmission, and related infrastructure investments, whether incurred by us, our utility and energy supply providers, or our data center development partners, is sensitive to prevailing interest rates and the availability of debt or equity financing on acceptable terms. Any inability of our partners to access capital when needed, and the limitations, cost, and competition for such capital, could increase the cost of the power on which we depend, delay or halt projects, or render certain facilities commercially unviable, and under certain of our arrangements, we bear these financing and capital costs directly or on a pass-through basis. Furthermore, newer sources of generation, such as solar, wind, battery storage, nuclear, and geothermal power, may not be available in the quantities or on the timelines we require, or may be available only at higher cost. Our facilities separately depend on access to reliable water for cooling, which in some regions is scarce, subject to use restrictions, or increasingly costly. Any of the foregoing could adversely affect the availability of the power or water we require, increase our costs, or limit our ability to develop, expand, or operate our data center facilities, which could adversely affect our business, financial condition, and results of operations. Competition for access to electrical supply and data center locations with adequate power availability is intense, and we compete for such access with well-capitalized CSPs, some of which produce and develop competing AI models, cryptocurrency mining operations, and other large-scale electricity consumers. In addition to, or sometimes in lieu of, grid-based electricity, an increasing share of data centers are being developed with dedicated on-site power generation capacity that supplies electricity directly to the facility independent of any utility-operated electric grid. The reliability of such off-grid power generation solutions varies by the underlying technology, the equipment used, and the operator and will reflect site-by-site operational and environmental profiles. Development of this new capacity in turn requires power generation and electrical infrastructure that are themselves subject to supply challenges and operational complexity. For example, certain of our planned data center facilities rely on dedicated on-site natural gas-fired generation, which exposes us to fuel price volatility and supply disruptions that are outside of our control and for which we bear the cost on a pass- through basis. These facilities are also subject to constraints on pipeline capacity and firm fuel transportation necessary to deliver natural gas. As data center operators increasingly rely on natural gas-fired generation, and because behind-the-meter and on-site arrangements are feasible only in some jurisdictions given the applicable regulatory frameworks, we expect increased competition among users for the same natural gas supply and pipeline capacity in those areas. This competition could drive up the price of natural gas in such areas and may adversely affect our ability to contract for firm fuel supply and transportation and to secure the pipeline connections and laterals our facilities require. These dynamics present several related risks. We may be unable to secure firm gas supply and transportation during the development of a facility, causing a planned site to be delayed or abandoned; we may face fuel supply or delivery disruptions once a facility is operating; and because our arrangements generally provide for fuel and related costs to be borne by us on a pass-through basis without cost caps, we remain exposed to increases in the cost of natural gas and its transportation. More broadly, the cost of electricity is subject to significant variability that is largely outside of our control, as wholesale electricity prices fluctuate with changing supply and demand, weather, fuel prices, tariffs or surcharges, and grid stress, and can rise sharply during periods of peak demand or constrained supply, and such increases in energy costs could adversely affect our results of operations. In some regions, including certain regions where we have contracted compute commitments, data center development has prompted public controversy and regulatory scrutiny regarding environmental impact, land and water use, and the allocation of limited power resources. For example, if our efforts to secure electrical power are perceived to affect other utility customers and the broader grid, regulators may impose conditions, standby charges, or other requirements intended to address such impacts. More broadly, our access to electrical power is subject to an evolving regulatory framework characterized by complexity, jurisdictional overlap, and rules that were largely designed around service by incumbent utility providers and existing generation arrangements and that may not readily accommodate new entrants or alternative approaches, which can result 35
Text is provided for reference. Check the original for tables, images, and exact formatting.